AGP Mining Consultants Inc.

Geology, Mine Engineering,
Processing & Project Management

Geology, Mine Engineering,
Processing & Project Management

 

September 2017
Global Energy Metals Corp.
Werner Lake Project
Global Energy announces the completion of a National Instrument 43-101 Resource Report carried out by AGP Mining Consulting Inc. on the Werner Lake Cobalt Property around the historic underground workings at the "Old Mine Site", now referred to as the Minesite Deposit and the West Cobalt Deposit.
Read more..

March 2017
Wellgreen Platinum Ltd.
Yukon Territory Project
Happy Creek Minerals has announced an update to its mineral resource estimate completed by AGP Mining Consultants in accordance to NI 43-101 for the Ridley Creek zone, and a first-time resource for the BN zone on its 100% owned Fox tungsten property.
Read more..

February 2017
Happy Creek Minerals Ltd.
Fox Tungsten Project, British Columbia, Canada
Happy Creek Minerals has announced an update to its mineral resource estimate completed by AGP Mining Consultants in accordance to NI 43-101 for the Ridley Creek zone, and a first-time resource for the BN zone on its 100% owned Fox tungsten property.
Read more..

January 2017
Focus Graphite Inc.
Lac Knife, Flake Graphite Project, Quebec, Canada
Focus Graphite reports a 26% increase in Measured and Indicated Mineral Resources at its Lac Knife Flake Graphite project in Quebec. The updated Mineral Resource Estimate is based on 231 drill holes totalling 22,505 metres of historic and recent drilling and was prepared by AGP Mining Consultants Inc.
Read more..

September 2016
Luna Gold Corp.
Aurizona Gold Mine, Brazil
Luna Gold has announced the results of the pre-feasibility study on it’s 100% owned Aurizona Gold Mine project located in north-eastern Brazil. The PFS indicates that the project represents a robust, rapid pay-back, high margin, simple open pit mining project that demonstrates strong returns in the current gold price environment. AGP Mining Consultants prepared the mine plan, schedule, and mine capital and operating cost estimates for the PFS as part of the project team.
Read more..

October 2015
Entree Gold Inc.
Ann Mason Project, Nevada
Entree Gold files NI 43-101 Technical Report for Ann Mason Project, Nevada. The 2015 PEA was completed independently by AGP Mining Consultants in conjunction with Amec Foster Wheeler and Porcupine Engineering Services (PES). The QP’s responsible for the report include AGP’s Gordon Zurowski, P. Eng, Jay Melnyk, P. Eng., Pierre Desautels, P. Geo and Lyn Jones, P. Eng., in addition to engineers and geologists from Amec Foster Wheeler and PES.
Read more..

September 2015
Alabama Graphite Cord.
Coosa Graphite Project, Coosa County, Alabama
Alabama Graphite has engaged AGP to complete a Preliminary Economic Assessment (“PEA”) on their 100% owned Coosa Graphite Project in Alabama, USA. In addition, AGP has provided technical assistance with a selection of graphitic samples for a pilot plant program to be carried out at SGS Lakefield, Ontario.
Read more..

September 2015
Entree Gold Inc.
Ann Mason Project, Nevada
Entrée Gold has announced that it has received the results of an updated Preliminary Economic Assessment, completed by AGP Mining Consultants, for its 100%-owned Ann Mason copper-molybdenum porphyry deposit in Nevada.
Read more..

April 2015
Belo Sun Mining Corp.
Volta Grande Gold Project, Brazil
Belo Sun has announced the completion and filing of a Feasibility Study completed on their 100% owned Volta Grande Project. The report contains positive results was completed by AGP Mining Consultants; it has been filed on SEDAR.
Read more..

January 2015
Global Minerals Ltd.
Strieborná Silver-Copper Project, Slovakia
Global Minerals is pleased to announce it has filed on SEDAR the Preliminary Economic Assessment (PEA) which was completed by AGP Mining Consultants for its 100% owned Strieborná silver-copper-antimony deposit in Slovakia.
Read more..

December 2014
Global Cobalt Corp.
Werner Lake Cobalt Project, Ontario
Global Cobalt has engaged AGP to complete a resource model and NI 43-101 report for the Werner Lake Cobalt project commencing immediately.
Read more..

December 2014
Global Minerals Ltd.
Strieborna Silver-Copper Project, Slovakia
Global Minerals releases positive results in the Preliminary Economic Assessment completed by AGP for the Strieborna Silver-Copper project in Slovakia.
Read more..

February 2014
Belo Sun Mining Corp.
Volta Grande Gold Project, Brazil
Belo Sun has announced a Preliminary Econoimic Assessment completed by AGP Mining for a staged development approach based on the updated mineral resource for its 100% owned Volta Grande gold project in Para State, Brazil.
Read more..

December 2013
Focus Graphite Inc.
Lac Knife Graphite Deposit
AGP Mining has been retained to work in conjunction with Met-Chem in the completion of a Feasibility Study of the Lac Knife deposit. AGP will provide the resource model along with assistance on the geology aspects of the Feasibility Study, including contribution to Met-Chem's NI43-101 report.

September 2013
Northern Graphite Corporation
Bissett Creek Project
Northern Graphite announces the economics in the previously released bankable Feasibility Study for the Bissett Creek project have been updated by AGP Mining Consultants to incorporate a new and larger resource estimate with some modifications to the capital and operating cost assumptions, and lower graphite prices.
Read more..

September 2013
Roxgold Inc.
Yaramoko Gold Project
Roxgold is pleased to announce the results of its Preliminary Economic Assessment ("PEA") completed by AGP Mining Consultants, Toronto and prepared pursuant to National Instrument 43-101 for the 55 Zone on its 100% owned Yaramoko exploration permit in Burkina Faso.
Read more..

August 2013
Coastal Gold Corp
Hope Creek Gold Project
Coastal Gold has been working on a number of initiatives following the successful merger with Ridgemont Iron Ore on June 28, 2013 and are moving ahead rapidly, working closely with AGP Mining Consultants to plan site work for the Preliminary Economic Assessment.
Read more..

May 2013
Northern Graphite Corporation
Bissett Creek Ontario Project
Northern Graphite recently announced a new resource estimate for the Bissett Creek graphite project which was prepared by AGP Mining Consultants Inc. and based on results from a recent 61 hole, 3,782 meter drill program. The drill program successfully achieved its objective of upgrading a significant portion of inferred resources to the measured and indicated categories.
Read more..

April 2013
Roxgold Inc.
Yaramoka 55 Zone – Burkina Faso
Roxgold was pleased to announce the SEDAR filing of a technical report prepared by AGP Mining Consultants titled "Resource Update Report for the Yaramoko, 55 Zone, West-Central Burkina Faso". There are no material differences between the mineral resource estimate contained in Roxgold's March news release and the Technical Report filed this month.
Read more..

March 2013
Roxgold Inc.
Yaramoka Concession – Burkina Faso
Roxgold has announced an updated resource estimate for the 55 Zone deposit. The estimate was undertaken by AGP Mining Consultants and is based on 81,105 m of drilling and was prepared in accordance with NI 43-101 standards.
Read more..

February 2013
Frontera Copper Corporation
Piedras Verde Mine
Frontera Copper, through its subsidiary Cobre del Mayo S.A. de C.V., has requested AGP Mining perform Strategic Mine Planning Studies at the Piedras Verde Mine in the state of Sonora, Mexico.

January 2013
Azure Minerals
Promontorio Project, Chihuahua Mexico
AGP has been retained by Azure Minerals to estimate mineral resources at their Promontorio Cu-Au-Ag project located approximately 200 km west-southwest of the city of Chihuahua in the state of Chihuahua in Northern Mexico.

November 2012
Entrée Gold
Ann Mason Project
Entrée has filed a NI43-101 Technical Report entitled "Entrée Gold Inc., Preliminary Economic Assessment on the Ann Mason Project, Nevada, U.S.A." The report was completed by AGP Mining Consultants and relates to the PEA and updated resource estimate for the Ann Mason copper-molybdenum porphyry deposit.
Read more..

October 2012
Global Minerals Ltd.
Strieborná Project, Slovakia
Global Minerals Ltd. has retained AGP Mining Consultants Inc. (AGP) to begin a series of engineering trade-off studies to evaluate various development scenarios for the Strieborná project. Results from these studies should be instrumental in testing the economics of the project and ultimately be incorporated into future development study.
Read more..

October 2012
Entrée Gold
Blue Hill Projects, Nevada
Entrée Gold has received the initial resource estimate from AGP Mining for their Blue Hill copper deposit.
Read more..

October 2012
Northern Graphite Corporation
Bissett Creek Project
Northern Graphite has retained AGP Mining Consultants to update the current resource and reserve estimates, mine design and economic model once the new drilling results are available which is expected to be before year end. Additionally, AGP will review assay methodologies and procedures to investigate the assay reconciliation concerns noted in previous testwork programs.
Read more..

August 2012
Roxgold Inc.
Burkina Faso, Africa
Roxgold has received the initial resource estimate from AGP Mining for the 55 Zone on its 100% owned Yaramoko Property.
Read more..

August 2012
Nevsun Resources Ltd.
Bisha Mine Project
In conjunction with the work done by AGP Mining Consultants, Nevsun has recently announced new increased base metal Canadian National Instrument 43-101 compliant mineral resources and reserves estimates at its Bisha Mine in Eritrea. Expressed as contained metal, the copper reserves estimate is 6% higher and the zinc reserves estimate is 38% higher as of May 31, 2012, compared with the previous reserves estimate effective date January 1, 2011.
Read more..

July 2012
Carpathian Gold Inc.
Rovina Valley Project
Carpathian Gold announced its updated National Instrument 43-101 compliant mineral resource estimate ("2012 Resource Estimate") as provided by AGP Mining Consultants which includes the Colnic, Rovina and Ciresata gold-rich copper porphyry deposits. All three deposits are in close proximity to one another and amenable to a central ore processing facility as described in the Preliminary Economic Assessment ("PEA") completed in March 2010. Colnic and Rovina are amenable to open-pit mining and Ciresata to bulk underground mining. AGP has estimated the 2012 Resource Estimate for the RVP with a date cut off of April 23, 2012, updating the last resource estimate from November 2008 ("2008 Resource Estimate") to include results from an additional 95 drill holes for 57,541 metres and utilized a total of 120,256 metres of diamond drill hole data from 251 drill holes.
Read more..

June 2012
Roxgold Inc.
Burkina Faso, Africa
AGP is pleased to announce their engagement by Roxgold to complete a Preliminary Economic Assessment (PEA) and a NI-43-101 Compliant Technical Report for the Yaramoko Concession Project located in Burkina Faso.

April 2012
Roxgold Inc.
Burkina Faso, Africa
Roxgold Inc., Top Overall Company in TSX-V 50 for 2012, has engaged AGP Mining Consultants to prepare an initial resource on the 55 Zone of the Yaramoko property and prepare an updated Technical Report in compliance with NI 43-101 Standards.
Read more..

April 2012
Colossus Minerals Inc.
Serra Pelada, Brazil
Colossus Minerals announces significant achievement in metallurgical recoveries of platinum group metals from Serra Pelada, Brazil.
Read more..

March 2012
Bisha Mining Company
Eritrea, Africa
Principal, Jay Melnyk is pleased to have Bisha extended their contract with AGP to include Phase II Mine Planning and Mineral Reserves Update work.

March 2012
PDAC – Toronto, ON
AGP Principals, Andy Holloway, Gordon Zurowski and Pierre Desautels will be in attendance at the PDAC Conference scheduled for March 4-7th, 2012.
If you are unable to connect with them, please contact the office at agp@agpmining.com, we will ensure your communications are forwarded.

February 2012
Castillian Resources Corp.
Hope Brook Project, Newfoundland
AGP is pleased to share in Castillian’s recent press release information and continues to offer Technical Services to Castillian as required.  For complete press release pdf, please click to follow link: http://www.castillian.ca/docs/castillian-2012-drill-program-targets-major-extensions-to-gold-zones-at-hope-brook-newfoundland

February 2012
Entrée Gold
Ann Mason and Blue Hill Projects, Nevada
After completion of various internal studies for Entrée Gold, the Company has retained the services of AGP to begin preparation of a Preliminary Economic Assessment for their Ann Mason and Blue Hill copper deposits. Re-assaying of portions of the historical Anaconda core, which will provide additional gold, silver and molybdenum data to support the upgraded resource estimate and PEA, is also underway. AGP looks forward to executing and completing this interesting study for this new client. View the Entrée Gold Press Release.

January 2012
Colossus Minerals Inc.
Serra Pelada Project, Brazil
AGP continues to provide project support to Colossus Minerals with AGP Principal Andy Holloway accepting a part-time position as the Colossus Consulting Metallurgist. Andy is working with DRA (Toronto) and P&K Engineers (Brazil) to design and construct the Serra Pelada Gravity Plant and also with Blue Coast Metallurgy to develop a PGM extraction process for this exciting project. See www.colossusminerals.com for site photographs and presentations.

September, 2011
Colossus Minerals Inc.
Serra Pelada Project, Brazil
AGP has been contracted by Colossus Minerals to provide metallurgical testwork supervision and process design/engineering services for the Serra Pelada Au-PGM project in Para State, Brazil.

August, 2011
Carpathian Gold Inc.
Rovina Valley Project - Pre-Feasibility Study
AGP is pleased to announce they will participate on the Pre-Feasibility Study for Carpathian Gold’s Rovina Valley Project.  This will include geologic resource update, mine design (both open pit and underground), metallurgy and process design.  In addition, AGP will be providing project management services together with Carpathian Gold’s management team in leading a multi-discipline team made up of specialist companies from various parts of the world working together with Carpathian Gold’s Romanian technical experts.

June, 2011
Romios Gold Resources Inc.
Trek Property
AGP is pleased to announce completion of the NI43-101 Technical Report for Romios Gold, Trek Property. This geology report is posted on the Romios Gold website at: http://www.romios.com/s/Trek.asp

June, 2011
Global Minerals
Strieborná Property - Preliminary Economic Assessment Review
AGP has been commissioned to review and assess all current technical inputs and reports by various 3rd parties for the Strieborna NI 43-101 Preliminary Economic Assessment.

June, 2011
Northern Vertex Capital Inc.
Moss Property - Technical Services Agreement
Northern Vertex has signed a Technical Services Agreement with AGP to facilitate a review of current and historical drill programs and datasets.

May, 2011
Carpathian Gold Inc.
Rovina Valley Project, Romania - Resource Estimate Update
AGP has been contracted to perform the geological services required to produce an NI 43-101 compliant geological model and resource estimate update for the Rovina Valley Project.

May, 2011
MinCore Inc.
Tameapa Property - NI 43-101 Technical Report and PEA
AGP has completed the NI 43-101 Technical Report and PEA for MinCore's Tameapa Project located in the front range of the Sierra Madre Mountains in Sinaloa State, Northwestern Mexico. The property hosts two mineral deposits; the Pico Prieto Copper-Molybdenum Porphyry and the Venado Molybdenum-Copper Breccia. The Pico Prieto is planned to be a large scale open pit while Venado is a small scale underground with both proposed to feed a 100,000 tonne per day process plant.

May, 2011
Victory Nickel Inc.
Minago Property - Geology Model Update
AGP was excited to complete the resource model update for Victory Nickel, Minago Property. The results of the updated model are posted on Victory Nickel's website at: www.victorynickel.ca/news/

March 6-9, 2011
PDAC
AGP Mining Consultants
Andy Holloway, Gordon Zurowski and Pierre Desautels will be in attendance at the 2011 PDAC being held at The International Convention Centre in Toronto.

February 2011
Watts, Griffis & McOuat (WGM)
Trade Winds Venture Inc. - Technical Report & Mineral Resource Update
AGP was pleased to assist WGM with an Independent Mineral Resource Estimate and Technical Report for the M Zone and North Walter Lake Zone, within the Block A Joint Venture property. The technical report, now uploaded onto the SEDAR website covers the Block A Property, incorporating the results of the 2010 drill program with revised economic parameters for the resource pit shell.

January 2011
Energizer Resources Inc.
Giant Vanadium Project
AGP Mining Consultants Inc. is pleased to announce the completion of an updated NI 43-101 compliant Technical Report for the Green Giant Project located in the Fotadrevo, Province of Toliara, Madagascar, dated January 14, 2011. The Green Giant Vanadium project is 100% owned by Energizer Resources Inc.

December 2010
Spanish Mountain Gold Ltd.
Spanish Mountain Project
AGP announces the completion of a NI 43-101 compliant Technical Report for the Spanish Mountain Project dated December 20, 2010. The property is located northeast of Williams Lake, BC.

November 2010
Sunridge Gold Corp.
Asmara Project - Eritrea - Trade-off Study
AGP is pleased to again be working with Sunridge Gold. Sunridge have commissioned AGP to prepare a metallurgical trade-off study designed to assist with scope definition for future engineering studies.

October 2010
MinCore Inc.
Tameapa Project - Sinaloa Mexico - Mineral Resource Estimate and Preliminary Economic Assessment
AGP is excited to commence work with MinCore by providing geological, metallurgical and mine engineering services to complete a Mineral Resource Estimate PEA of the Tameapa Project in Sinaloa, Mexico.

October 2010
South American Silver Corp.
Malku Khota Project - Bolivia - Technical Assistance
AGP's technical staff have been retained to provide geological and engineering support to advance the Malku Khota project. This is a Silver and Indium resource located in Bolivia.

October 2010
Polymet Mining Corp.

NorthMet Project, Hoyt Lakes, Minnesota - Technical Support
AGP's technical staff have been providing support in the areas of mine planning, cost estimation and geology. This premier poly-metallic project is steadily advancing towards permit completion and construction.

October 2010
Hana Mining Ltd.

Ghanzi Project, Botswana Africa - Technical Assistance
AGP Mining technical staff have been assisting Hana Mining with the preparation of a Preliminary Economic Assessment (PEA) study for their Ghanzi project in Botswana. This exciting copper/silver property has a currently drilled strike length in excess of 60 kilometres with several areas potentially suitable for open pit mining. AGP's Michael Waldegger, P.Geo. recently visited the property in advance of his work preparing an updated NI 43-101 Resource together with Hana personnel. This resource will be used as the basis for the upcoming PEA study. AGP's geotechnical partner, BGC Engineering will be arriving on site mid-October to complete geotechnical investigations in support of that same study.

October 2010
DRA Americas Inc.

Santa Rita Mine in Bahia, Brazil - Upgrade Project
AGP’s Principal Process Engineer, Andy Holloway, will be working collaboratively with Dowding Reynard and Associates (DRA) to perform upgrade work on the Santa Rita Process Plant.

October 2010
Spanish Mountain Gold Ltd.

Spanish Mountain Project in British Columbia, Canada – Preliminary Economic Assessment (PEA)
The PEA for Spanish Mountain Gold Ltd. (SMG) is progressing toward completion. The proposed completion date is December, 2010

October 2010
Trade Wind Ventures Inc.

Block A, Timmins Ontario - Block Model Update
In association with WGM, AGP continues to work with Trade Wind Ventures in expanding the resource base from the previous NI43-101. Pierre Desautels, Principal Geologist, for AGP Mining has been working together with Trade Wind staff on the update of his past work for them. An updated model is expected shortly.

September 2010
Kootenay Gold Inc.

Promontorio Property in the Municipality of Cajeme/Rosario,Sonora, Mexico - NI 43-101 Resource Estimation
The NI 43-101 Resource was completed by AGP’s Michael Waldegger, P.Geo. on September 28, 2010 and filed to Sedar September 30th, 2010.

August 2010
Sunridge Gold Inc.

Asmara Project in Eritrea, Africa – Strategic Production Study
AGP's Process and Mining group have completed the desktop level study of operational scenarios for the multiple deposits within the Asmara Project.