Menu

AGP Mining technical staff has been assisting Hana Mining with the preparation of a Preliminary Economic Assessment (PEA) study for their Ghanzi project in Botswana. This exciting copper/silver property has a currently drilled strike length in excess of 60 kilometres with several areas potentially suitable for open pit mining. AGP's Michael Waldegger, P.Geo. recently visited the property in advance of his work preparing an updated NI43-101 resource together with Hana personnel. This resource will be used as the basis for the upcoming PEA study. AGP's geotechnical partner, BGC Engineering will be arriving on site mid-October to complete geotechnical investigations in support of that same study.