Menu

IAMGOLD announced positive results from a Feasibility Study (FS) for its Boto Gold project. The FS was completed by AGP Mining and the results outline an economically robust project with an anticipated low cost of production and long operating life. The FS demonstrates a significant economic and operational improvement compared to the Pre-feasibility Study (PFS) results announced in February of this year.